HIGHWAYS
WASTE
RAIL
CONCRETE FRAMES
M56 - Bowden Bridge Manchester
Client:
Carillion plc
Package:
Labour, Plant and Temporary Materials
Project Details:
New bridge with “off site” construction for placement during motorway closure
Formwork:
1,232 m
2
Concrete:
479m
3
Reinforcement:
178 tonne
Thornton Waste to Resource Plant - Fleetwood
Client:
Barhale Construction plc
Package:
Labour, Minor Plant and Temporary Materials
Project Details:
Green Waste, OGM and Biofilter Structures
Formwork:
15,463 m
2
Reinforcement:
1,793 tonne
Blurton - Ormiston Sir Stanley Matthews Academy - Stoke on Trent
Client:
Wates Construction Ltd
Package:
Labour, Plant and Materials
Project Details:
Reinforced concrete frame including stair cores and lift shafts
Formwork:
13,400 m
2
Concrete:
3,950 m
3
Reinforcement:
731 tonne
Fabric Mesh:
25,000 m
2
Carlisle Northern Development Route - Carlisle
Client:
Birse Civils Ltd
Package:
Labour, Plant and Temporary Materials
Project Details:
1 No 160 meter span River Bridge, I No Concrete Bridge
3 No Underpasses, 160 Meter Long Retaining Wall and 30 No Flood Culverts.
Formwork:
6,151m
2
Concrete:
3,277m
3
Reinforcement:
508 Tonne.
Longley Lane Waste Recycle Centre - Manchester
Client:
Costain Group plc
Package:
Labour, Plant and Materials
Project Details:
Tank bases, bund walls, push walls and slabs to multiple buildings
to one of the Greater Manchester Waste main reception plants
Formwork:
12,876 m
2
Concrete:
7,625 m
3
Reinforcement:
644 Tonne.
BNRR (M6 Toll Road) - Birmingham
Client:
CAMBBA(Carillion, Alfred McAlpine, Balfour Beatty, AMEC)
Package:
Labour and Temporary Materials
Project Details:
20nr Bridges, 3nr Underpasses, 6nr Toll Tunnels, Precast Stringcourse
Formwork:
50,600 m
2
Reinforcement;
3622 Tonne